People assume a concrete ceiling is the easy case. It is solid, it does not flex like plasterboard, and surely anything screwed into it will hold.

People assume a concrete ceiling is the easy case. It is solid, it does not flex like plasterboard, and surely anything screwed into it will hold. In practice, concrete ceilings cause more failed chandelier installs in flats than timber ones do in houses, and nearly all of them come from the same few mistakes: a plastic wall plug pushed into a hole that was drilled into a void, an anchor set in the plaster skim instead of the slab, or a drill bit that went straight through a buried cable.
I have hung lights in a lot of post-war apartment blocks, and the ceilings vary far more than they look from below. Some are solid poured slabs 180 mm thick. Many are precast hollow-core planks with tubes running through them, where the concrete under your drill bit may be only 25 to 35 mm thick before you break into air. The fixing that is right for one is dangerous in the other, so the first job is working out which one you have.
Find out what is above your head
Start with the building. Blocks built from the 1960s onward in much of Europe often used hollow-core planks because they went up quickly. Older tenement buildings may have concrete with clay pot infill, or steel beams with concrete poured between them. Newer buildings are more likely to be solid slabs. If you can find the original drawings, or a neighbour who has had work done, that saves guessing.
The test drill tells you more than anything else. Use an SDS drill with a 6 mm bit and drill slowly at the fixing point, holding the drill steady and feeling for the moment resistance drops. In solid concrete the bit keeps grinding at the same rate all the way to 60 mm or more. In hollow-core plank you will feel it suddenly give, usually somewhere around 30 mm, and the dust will stop coming out. Measure the depth with a piece of wire. That number decides everything that follows.
Before any of this, scan the area. In many flats the lighting cable runs in conduit buried in the slab or in the screed, often in a straight line from the wall to the ceiling point. A decent multi-scanner set to live wire and metal will usually pick it up, and it will also find rebar. I mark everything I find in pencil and keep the fixing at least 50 mm away from any cable route. Turn off the lighting circuit at the consumer unit before drilling, and check it is dead with a voltage tester, not by flicking the switch.
Plastic plugs are the wrong answer
The fixing most people reach for is a brown or red plastic plug and a screw hook from the pack that came with the light. Plenty of installers will tell you this is fine for anything under 10 kg. I disagree, and not only for heavy fittings.
A plastic plug holds by friction against the sides of the hole. In good concrete, drilled to the right size, it can be surprisingly strong. But ceiling concrete is rarely perfect. Holes drilled into hollow-core plank often break out into the void and leave a thin shell for the plug to grip. Holes drilled into old ceilings may be mostly in the plaster skim, which can be 10 to 15 mm thick and crumbles easily. And plastic creeps under constant load, especially in a warm room near a ceiling where heat collects. I have taken down several chandeliers that had dropped 5 or 6 mm over a couple of years as the plug slowly pulled out.
For anything hanging from a ceiling, I use a metal anchor rated by the manufacturer for overhead use, and I treat the rating with a margin of at least four times the weight of the fitting. If the light weighs 12 kg, I want a fixing rated well above 48 kg in the material it is actually going into.
Choosing the right anchor for each ceiling
Here is how I match fixings to what the test drill found.
| Ceiling type | Typical sound depth | Fixing I use | Notes |
|---|---|---|---|
| Solid poured slab | 60 mm or more | M8 wedge anchor or sleeve anchor with eye bolt | Drill to the anchor maker's stated depth, clean out dust, torque to spec |
| Hollow-core plank, hitting the web | 50 mm or more | Wedge or sleeve anchor, same as solid | Only if the full depth is solid. Webs are narrow, so test drill first |
| Hollow-core plank, hitting a void | 25 to 35 mm, then air | Anchor designed for hollow-core, or a cavity toggle rated for concrete | Never use expansion anchors that need to grip deep sides |
| Thick plaster over concrete | Varies | Longer anchor so the expanding part sits fully in concrete | Measure skim thickness and add it to the embed depth |
One point that catches people: dust. An expansion anchor in a hole full of concrete dust grips much less than its rating. I blow the hole out with a hand pump, brush it, and blow it again. Takes thirty seconds.
For really heavy fittings, roughly over 25 kg, I would rather use a chemical resin anchor in solid concrete, or fit a small steel plate fixed with two anchors spaced apart to spread the load. At that weight it is also worth reading about whether the ceiling can take the load at all, because some hollow-core planks have limits on point loads.
Wiring and finishing
With the support in, the electrical side is the same as any ceiling light. The cable from the slab usually ends in a small box or just a coil of flex. Connect line, neutral, and earth with lever connectors or a proper terminal block, and keep the connections inside the canopy, not stuffed into a hole in the concrete. The chandelier hangs from the hook or eye bolt you fitted, never from the cable. If you have not done a full install before, the step by step guide to installing a chandelier safely covers the wiring order.
The canopy may not sit flat, because concrete ceilings are rarely perfectly level and the anchor may not land exactly where the cable comes out. A ceiling rose plate or a slim spacer helps. Some people hide the mess with a medallion, which works well and is covered in more detail in the installation section.
Before you let go, hang onto the light for a minute and give it a firm downward pull, roughly twice its weight if you can manage it. If anything moves, take it down and redo the fixing. I would rather spend an extra half hour than come back to a crack in the floor tiles.
FAQ
Can I use plastic plugs to hang a chandelier on concrete?
I would not. Plastic plugs can slip over time and often grip only plaster or a thin shell over a void. Use a metal anchor rated for overhead loads.
How do I know if my ceiling is hollow-core?
Test drill slowly with a 6 mm bit. If resistance suddenly drops after about 30 mm and dust stops, you have reached a void in a hollow-core plank.
What size anchor do I need for a chandelier?
For most domestic fittings an M8 wedge or sleeve anchor in solid concrete is plenty. Check the manufacturer's overhead rating and keep a margin of at least four times the light's weight.
Do I need an electrician to hang a chandelier on concrete?
Rules vary by country. In many places replacing a light on an existing circuit is allowed, but if you are unsure about the wiring or the fixing, get a qualified electrician.
More in Installation
Installation
Chandelier With No Ground Wire and How to Wire It Safely
You took down the old ceiling light, and inside the box there are only two wires, a black and a white, with no bare copper or...
Installation
How to Replace a Ceiling Fan With a Chandelier Safely
The ceiling fan in your dining room wobbles, hums and makes the room look like a rental, and you would rather have a chandelier...
Installation
How to Install a Chandelier Safely Step by Step
You have bought the chandelier, it is sitting in its box in the hallway, and the old ceiling light is still up there with its...